Renovate: Update all dependencies #55

Open
renovate wants to merge 1 commit from renovate-all into main
Member

This PR contains the following updates:

Package Update Change
alpine digest 865b95f2510918
woodpeckerci/plugin-git digest 1ce8789e6326a1

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | alpine | digest | `865b95f` → `2510918` | | woodpeckerci/plugin-git | digest | `1ce8789` → `e6326a1` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 👻 **Immortal**: This PR will be recreated if closed unmerged. Get [config help](https://github.com/renovatebot/renovate/discussions) if that's undesired. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0Mi43Ni4wIiwidXBkYXRlZEluVmVyIjoiNDIuOTIuMTQiLCJ0YXJnZXRCcmFuY2giOiJtYWluIiwibGFiZWxzIjpbXX0=-->
Renovate: Update woodpeckerci/plugin-git Docker digest to 589c46f
Some checks failed
ci/woodpecker/push/build Pipeline failed
7ce4792ec9
renovate changed title from Renovate: Update woodpeckerci/plugin-git Docker digest to 589c46f to Renovate: Update woodpeckerci/plugin-git Docker digest to e6326a1 2026-01-26 08:06:13 +01:00
renovate force-pushed renovate-all from 7ce4792ec9
Some checks failed
ci/woodpecker/push/build Pipeline failed
to 00620a3608
Some checks failed
ci/woodpecker/push/build Pipeline failed
2026-01-26 08:06:14 +01:00
Compare
renovate changed title from Renovate: Update woodpeckerci/plugin-git Docker digest to e6326a1 to Renovate: Update all dependencies 2026-01-28 08:06:10 +01:00
renovate force-pushed renovate-all from 00620a3608
Some checks failed
ci/woodpecker/push/build Pipeline failed
to 952de5f7f0
Some checks failed
ci/woodpecker/push/build Pipeline failed
2026-01-28 08:06:10 +01:00
Compare
Some checks failed
ci/woodpecker/push/build Pipeline failed
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin renovate-all:renovate-all
git switch renovate-all

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff renovate-all
git switch renovate-all
git rebase main
git switch main
git merge --ff-only renovate-all
git switch renovate-all
git rebase main
git switch main
git merge --no-ff renovate-all
git switch main
git merge --squash renovate-all
git switch main
git merge --ff-only renovate-all
git switch main
git merge renovate-all
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
verdigado-images/container-pre-commit!55
No description provided.